IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0053 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $7,196 $1,904 n/a
MU0053 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $79,472 $58,598 n/a
MU0053 # 03 Y:2024 03 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,429 $4,900 n/a
MU0053 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $439 $51 n/a
MU0053 # 01 Y:2024 01 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $456 $1,958 n/a
MU0053 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $865 $512 n/a
MU0053 # 06 Y:2024 06 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $955 $0 n/a
MU0053 # 10 Y:2024 10 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $16,560 $17,565 n/a
MU0053 # 07 Y:2024 07 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,119 $0 n/a
MU0053 # 12 Y:2024 12 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $210 $546 n/a
MU0053 # 11 Y:2024 11 2024 INSTALL TIMERS AND/OR THERMOSTATS $473 $140 n/a
MU0053 # 09 Y:2024 09 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $90 $0 n/a
UM0395 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,425 $15,571 Not Implemented
UM0395 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $222 $161 Not Implemented
UM0395 # 04 Y:2011 04 2011 RECOVER WASTE HEAT FROM EQUIPMENT $51,920 $110,521 Not Implemented
UM0395 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,323 $5,000 Not Implemented
UM0395 # 05 Y:2011 05 2011 HEAT WATER WITH EXHAUST HEAT $798 $2,261 Not Implemented
UM0395 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $8,974 $8,890 Not Implemented
UM0389 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,327 $325 Not Implemented
UM0389 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,641 $1,300 Not Implemented
UM0389 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $2,426 $1,142 Implemented
UM0389 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $891 $5,000 Implemented
UM0389 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $194 $10 Not Implemented
UM0389 # 07 Y:2011 07 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $12,809 $9,821 Implemented
UM0389 # 08 Y:2011 08 2011 REDUCE VENTILATION AIR $2,730 $900 Not Implemented