IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2202 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $135,581 $876,160 Implemented
UW2202 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,538 $9,763 Implemented
UW2202 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,233 $12,913 Implemented
UW2202 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,645 $10,782 Implemented
UW0040 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,477 $32,020 Not Implemented
UW0040 # 02 Y:2010 02 2010 KEEP BOILER TUBES CLEAN $82,215 $50,000 Implemented
UW0040 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $977,184 $420,000 Implemented
OR0312 # 07 Y:1998 07 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $11,220 $44,000 Not Implemented
OR0312 # 11 Y:1998 11 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,455 $4,459 Implemented
OR0312 # 10 Y:1998 10 1998 OPTIMIZE PLANT POWER FACTOR $2,358 $7,000 Not Implemented
OR0312 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,254 $1,000 Implemented
OR0312 # 08 Y:1998 08 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $8,025 $55,400 Not Implemented
OR0312 # 06 Y:1998 06 1998 MOVE PRODUCT USING MECHANICAL MEANS $46,000 $147,500 Implemented
OR0312 # 05 Y:1998 05 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,805 $2,100 Not Implemented
OR0312 # 04 Y:1998 04 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $26,975 $14,685 Not Implemented
OR0312 # 03 Y:1998 03 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $16,830 $4,300 Not Implemented
OR0312 # 02 Y:1998 02 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,110 $0 Implemented
OR0312 # 01 Y:1998 01 1998 ELIMINATE SHIFT $25,580 $50,000 Implemented
OR0278 # 01 Y:1996 01 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,492 $0 Implemented
OR0278 # 06 Y:1996 06 1996 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,813 $70,548 Not Implemented
OR0278 # 05 Y:1996 05 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,797 $7,440 Not Implemented
OR0278 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,832 $11,104 Implemented
OR0278 # 03 Y:1996 03 1996 UPGRADE CONTROLS ON COMPRESSORS $8,541 $2,640 Implemented
OR0278 # 02 Y:1996 02 1996 RECOVER WASTE HEAT FROM EQUIPMENT $6,734 $1,778 Implemented