Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsSIC | 267 | Misc. Converted Paper Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0502 # 05 Y:2001 | 05 | 2001 | REPLACE BOILER | $1,908 | $1,908 | Not Implemented |
MA0502 # 04 Y:2001 | 04 | 2001 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,510 | $15,000 | Not Implemented |
MA0502 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,461 | $6,200 | Not Implemented |
MA0502 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,771 | $3,000 | Not Implemented |
MA0502 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,860 | $45,850 | Not Implemented |
MA0502 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,998 | $40,000 | Not Implemented |
UU0016 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,195 | $915 | Implemented |
UU0016 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,550 | $6,283 | Not Implemented |
UU0016 # 01 Y:2001 | 01 | 2001 | INSTALL SKYLIGHTS | $53,853 | $16,000 | Not Implemented |
UU0016 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $188 | $35 | Implemented |
UU0016 # 04 Y:2001 | 04 | 2001 | USE SYNTHETIC LUBRICANT | $330 | $400 | Not Implemented |
MA0493 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $516 | $1,000 | Implemented |
MA0493 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,165 | $3,750 | Not Implemented |
MA0493 # 02 Y:2001 | 02 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,846 | $0 | Implemented |
MA0493 # 06 Y:2001 | 06 | 2001 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $161 | $100 | Implemented |
MA0493 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,613 | $150 | Implemented |
MA0493 # 07 Y:2001 | 07 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $350 | $0 | Implemented |
MA0493 # 01 Y:2001 | 01 | 2001 | ADOPT IN-HOUSE MATERIAL GENERATION | $48,702 | $180,000 | Not Implemented |
CO0491 # 05 Y:2001 | 05 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,870 | $1,300 | Implemented |
CO0491 # 01 Y:2001 | 01 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $20,780 | $61,010 | Implemented |
CO0491 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,820 | $4,110 | Not Implemented |
CO0491 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,550 | $0 | Not Implemented |
CO0491 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,740 | $570 | Implemented |
CO0491 # 04 Y:2001 | 04 | 2001 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $3,630 | $1,000 | Not Implemented |
CO0491 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $220 | $210 | Not Implemented |