Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 267 | Misc. Converted Paper Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0225 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,851 | $2,775 | Implemented |
UU0225 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,399 | $15,200 | Implemented |
UU0225 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,047 | $11,922 | Implemented |
UU0225 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,874 | $0 | Implemented |
UU0225 # 01 Y:2023 | 01 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $39,842 | $126,388 | Implemented |
UL2306 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $103,804 | $14,859 | Not Implemented |
UL2306 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,055 | $314,019 | Not Implemented |
UL2306 # 03 Y:2023 | 03 | 2023 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,595 | $12,891 | Not Implemented |
UL2306 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $336 | $600 | Implemented |
UL2306 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,019 | $0 | Not Implemented |
CC0018 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,506 | $10,000 | n/a |
CC0018 # 06 Y:2023 | 06 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $95,279 | $350,000 | n/a |
CC0018 # 05 Y:2023 | 05 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $16,265 | $70,000 | n/a |
CC0018 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,300 | $0 | n/a |
CC0018 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,158 | $10,000 | n/a |
CC0018 # 01 Y:2023 | 01 | 2023 | INSULATE FEEDWATER TANK | $2,497 | $500 | n/a |
MS0412 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $3,382 | $1,476 | n/a |
MS0412 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,039 | $17,808 | n/a |
MS0412 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $108 | $0 | n/a |
MS0412 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,030 | $96,425 | n/a |
LE0542 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,898 | $60,000 | Not Implemented |
LE0542 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,492 | $12,810 | Implemented |
LE0542 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,207 | $1,900 | Implemented |
LE0542 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,690 | $37,053 | Not Implemented |
LE0542 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,677 | $3,000 | Not Implemented |