IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

175

matching recommendations
Reset
SIC 2672 Paper Coated And Laminated, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0152 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,440 $0 Implemented
CO0152 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,885 $15,000 Implemented
CO0152 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,650 $2,560 Implemented
CO0152 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $610 $5,000 Implemented
CO0152 # 06 Y:1989 06 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,680 $3,900 Implemented
CO0152 # 07 Y:1989 07 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,300 $5,000 Implemented
CO0152 # 08 Y:1989 08 1989 INSTALL SET-BACK TIMERS $244 $400 Implemented
CO0152 # 09 Y:1989 09 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,900 $250 Implemented
CO0152 # 10 Y:1989 10 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,765 $414 Implemented
RU0052 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $19,516 $2,000 Implemented
RU0052 # 04 Y:1989 04 1989 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,292 $6,000 Implemented
RU0052 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,620 $0 Implemented
TN0305 # 01 Y:1987 01 1987 SHUT OFF PILOTS IN STANDBY EQUIPMENT $2,479 $0 Implemented
TN0305 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,298 $210 Implemented
TN0305 # 06 Y:1987 06 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,034 $348 Implemented
TN0305 # 07 Y:1987 07 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $120 Implemented
UD0145 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,579 $19,613 Implemented
GT0112 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,062 $2,400 Implemented
GT0112 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $973 $506 Implemented
GT0112 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,411 $5,029 Implemented
GT0112 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,125 $1,500 Implemented
GT0112 # 05 Y:1982 05 1982 USE OPTIMUM THICKNESS INSULATION $3,585 $5,294 Implemented
GT0112 # 06 Y:1982 06 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,835 $0 Implemented
GT0112 # 07 Y:1982 07 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $656 $0 Implemented
GT0112 # 08 Y:1982 08 1982 RECOVER WASTE HEAT FROM EQUIPMENT $27,024 $31,500 Implemented