Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1982 |
Principal Product | PRESSURE SENSITIVE MATERIAL |
NAICS | n/a |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 114 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 4,414 Thousand Feet |
Production Hrs. Annual | 7,488 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $190,332 | 4,817,995 | kWh | $0.04 |
Natural Gas | $163,775 | 43,900 | MMBtu | $3.73 |
TOTAL ENERGY COSTS | $354,107 | |||
RECOMMENDED SAVINGS* | $164,271 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $57,671 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Paper | Electricity Usage | Natural Gas | Paper | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $11,062 Cost: $2,400 |
$11,062 | 279,894 | - | - | - | - |
$11,062 279,894 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $973 Cost: $506 |
$973 | 24,619 | - | - | - | - |
$973 24,619 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,411 Cost: $5,029 |
$6,411 | 162,368 | - | - | - | - |
$6,411 162,368 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,125 Cost: $1,500 |
- | - | $4,125 | 1,106 | - | - |
- - kWh |
$4,125 1,106 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $3,585 Cost: $5,294 |
- | - | $3,585 | 961 | - | - |
- - kWh |
$3,585 961 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,835 Cost: - |
$3,835 | - | - | - | - | - |
$3,835 - kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $656 Cost: - |
$656 | 16,413 | - | - | - | - |
$656 16,413 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $27,024 Cost: $31,500 |
- | - | $27,024 | 7,245 | - | - |
- - kWh |
$27,024 7,245 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6121 BURN WASTE PAPER FOR HEAT |
Savings: $106,600 Cost: $200,000 |
- | - | $138,100 | 26,340 | $(-31,500) | (-31,500) |
- - kWh |
$138,100 26,340 MMBtu |
$(-31,500) (-31,500) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $164,271 Cost: $246,229 |
$22,937 | 483,294 | $172,834 | 35,652 | $(-31,500) | (-31,500) | $22,937 483,294 kWh |
$172,834 35,652 MMBtu |
$(-31,500) (-31,500) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $57,671 Cost: $46,229 |
$22,937 | 483,294 | $34,734 | 9,312 | - | - | $22,937 483,294 kWh |
$34,734 9,312 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Paper | Electricity Usage | Natural Gas | Paper |