IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

497

matching recommendations
Reset
SIC 2673 Bags: Plastics, Laminated, & Coated
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0449 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,491 $20 Implemented
BD0449 # 07 Y:2014 07 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,288 $40 Not Implemented
BD0449 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,827 $2,800 Implemented
BD0449 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $739 $600 Not Implemented
BD0449 # 10 Y:2014 10 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $407 $700 Not Implemented
MZ0147 # 01 Y:2014 01 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $871 $360 Implemented
MZ0147 # 02 Y:2014 02 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented
MZ0147 # 03 Y:2014 03 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented
MZ0147 # 04 Y:2014 04 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $423 $470 Implemented
MZ0147 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,562 $42,645 Implemented
MZ0147 # 06 Y:2014 06 2014 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,184 $600 Implemented
MZ0147 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $9,950 $5,290 Not Implemented
MZ0147 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $2,616 $2,613 Not Implemented
MZ0147 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,212 $420 Implemented
MZ0147 # 10 Y:2014 10 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,158 $250 Implemented
WV0464 # 01 Y:2013 01 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,155 $6,768 Not Implemented
WV0464 # 02 Y:2013 02 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $17,893 $1,000 Not Implemented
WV0464 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,493 $17,640 Implemented
WV0464 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,702 $0 Implemented
WV0464 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $4,654 $984 Implemented
WV0464 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,550 $32 Implemented
WV0464 # 07 Y:2013 07 2013 DEVELOP A REPAIR/REPLACE POLICY $1,256 $1,068 Implemented
WV0464 # 08 Y:2013 08 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $987 $2,640 Not Implemented
WV0464 # 09 Y:2013 09 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $935 $3,500 Not Implemented
WV0464 # 10 Y:2013 10 2013 INSTALL TIMERS AND/OR THERMOSTATS $791 $1,320 Not Implemented