IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

255

matching recommendations
Reset
SIC 2674 Bags: Uncoated Paper & Multiwall
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0079 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,902 $1,000 Implemented
OR0079 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $473 $1,200 Not Implemented
OR0079 # 05 Y:1990 05 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,374 $31,672 Not Implemented
RU0074 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,313 $0 Not Implemented
RU0074 # 02 Y:1989 02 1989 IMPROVE LUBRICATION PRACTICES $1,790 $800 Not Implemented
RU0074 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,155 $325 Not Implemented
RU0074 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,206 $337 Not Implemented
RU0074 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,419 $500 Not Implemented
RU0074 # 06 Y:1989 06 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,443 $4,860 Not Implemented
RU0074 # 08 Y:1989 08 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,347 $2,390 Not Implemented
UD0201 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,240 $0 Implemented
UD0201 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $7,035 $11,000 Implemented
UD0201 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $284 $405 Not Implemented
KU0192 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,354 $200 Implemented
KU0192 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,299 $6,408 Implemented
KU0192 # 03 Y:1986 03 1986 AIR CONDITION ONLY SPACE NECESSARY $2,153 $1,032 Not Implemented
KU0192 # 04 Y:1986 04 1986 INSTALL AUTOMATIC STACK DAMPER $1,847 $1,900 Not Implemented
KU0192 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $816 $0 Not Implemented
KU0192 # 06 Y:1986 06 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,390 $100 Not Implemented
KU0192 # 07 Y:1986 07 1986 IMPROVE LUBRICATION PRACTICES $2,627 $1,700 Not Implemented
KU0192 # 08 Y:1986 08 1986 INSULATE BARE EQUIPMENT $293 $200 Implemented
KU0192 # 09 Y:1986 09 1986 INSULATE BARE EQUIPMENT $261 $300 Implemented
KU0192 # 10 Y:1986 10 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $237 $0 Not Implemented
LT0056 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $201 $300 Implemented
LT0056 # 02 Y:1986 02 1986 SHUT OFF PILOTS IN STANDBY EQUIPMENT $74 $130 Not Implemented