IAC logo
IAC Assessment: KU0192
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0192
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1986
Principal Product MULTI-WALLED PAPER BAGS
NAICS n/a
SIC 2674 - Bags: Uncoated Paper & Multiwall
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 24,000 Tons
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $187,025 3,004,982 kWh $0.06
Natural Gas $53,411 12,069 MMBtu $4.43
TOTAL ENERGY COSTS $240,436
RECOMMENDED SAVINGS* $27,277 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,207
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,354
Cost:
$200
$8,354 134,232 - - - - $8,354
134,232
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,299
Cost:
$6,408
$8,299 133,353 - - - - $8,299
133,353
kWh
-
-
MMBtu
-
-
$
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,153
Cost:
$1,032
- - $2,153 486 - - -
-
kWh
$2,153
486
MMBtu
-
-
$
04: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,847
Cost:
$1,900
- - $1,847 417 - - -
-
kWh
$1,847
417
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$816
Cost:
-
- - $1,316 297 $(-500) - -
-
kWh
$1,316
297
MMBtu
$(-500)
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,390
Cost:
$100
$2,390 - - - - - $2,390
-
kWh
-
-
MMBtu
-
-
$
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,627
Cost:
$1,700
$2,627 42,204 - - - - $2,627
42,204
kWh
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$293
Cost:
$200
$328 5,275 $(-35) (-8) - - $328
5,275
kWh
$(-35)
(-8)
MMBtu
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$261
Cost:
$300
$292 4,689 $(-31) (-7) - - $292
4,689
kWh
$(-31)
(-7)
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$237
Cost:
-
$237 3,810 - - - - $237
3,810
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$27,277
Cost:
$11,840
$22,527 323,563 $5,250 1,185 $(-500) - $22,527
323,563
kWh
$5,250
1,185
MMBtu
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$17,207
Cost:
$7,108
$17,273 277,549 $(-66) (-15) - - $17,273
277,549
kWh
$(-66)
(-15)
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes