IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 2675 Die-cut Paper And Board
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0541 # 02 Y:2015 02 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,334 $1,131 Not Implemented
NC0541 # 12 Y:2015 12 2015 INSTALL TIMERS AND/OR THERMOSTATS $308 $600 Not Implemented
NC0541 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $935 $4,256 Not Implemented
NC0541 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $116 $240 Not Implemented
NC0541 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $104 $100 Implemented
NC0541 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $627 $470 Not Implemented
NC0541 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $634 $3,000 Not Implemented
NC0541 # 06 Y:2015 06 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,054 $5,000 Not Implemented
NC0541 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $536 $918 Not Implemented
NC0541 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $299 $405 Not Implemented
NC0541 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $596 $160 Implemented
NC0541 # 01 Y:2015 01 2015 DEVELOP STANDARD OPERATING PROCEDURES $27,300 $10,000 Not Implemented
TN0351 # 01 Y:1988 01 1988 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $106,613 $25,500 Implemented
TN0351 # 03 Y:1988 03 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,397 $14,940 Implemented
TN0351 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,130 $3,800 Implemented
TN0351 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,132 $1,055 Not Implemented
TN0351 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,880 $1,800 Implemented
TN0351 # 07 Y:1988 07 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $289 $30 Implemented