Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166

matching recommendations
Reset
SIC 2676 Sanitary Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1704 # 09 Y:2017 09 2017 USE PHOTOCELL CONTROLS $1,262 $630 Not Implemented
UK1704 # 12 Y:2017 12 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $292 $775 Not Implemented
UK1704 # 07 Y:2017 07 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $9,390 $9,300 Implemented
UK1704 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,480 $18,700 Implemented
UK1704 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,401 $43,120 Implemented
UK1704 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,970 $0 Implemented
UK1704 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $5,402 $8,550 Implemented
UK1704 # 10 Y:2017 10 2017 CLEAN CONDENSER TUBES $2,467 $650 Implemented
UK1704 # 04 Y:2017 04 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $36,644 $16,350 Not Implemented
UK1704 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,756 $5,320 Implemented
UK1704 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,541 $0 Implemented
UK1704 # 11 Y:2017 11 2017 REDUCE FLUID FLOW RATES $2,428 $1,125 Not Implemented
IP0056 # 14 Y:2016 14 2016 OPTIMIZE PLANT POWER FACTOR $14,198 $22,745 Not Implemented
IP0056 # 13 Y:2016 13 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,149 $51,579 Not Implemented
IP0056 # 12 Y:2016 12 2016 APPLY FOR INVESTMENT INCENTIVES $5,810 $5,000 Not Implemented
IP0056 # 15 Y:2016 15 2016 APPLY FOR INVESTMENT INCENTIVES $1,896 $5,000 Not Implemented
IP0056 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $311 $218 Implemented
IP0056 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,909 $1,267 Not Implemented
IP0056 # 08 Y:2016 08 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,273 $2,406 Not Implemented
IP0056 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $356 $170 Not Implemented
IP0056 # 06 Y:2016 06 2016 APPLY FOR INVESTMENT INCENTIVES $29,356 $10,000 Not Implemented
IP0056 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,870 $300 Implemented
IP0056 # 02 Y:2016 02 2016 PAY BILLS ON TIME TO AVOID LATE FEES $1,368 $0 Implemented
IP0056 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,612 $0 Not Implemented
IP0056 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,759 $165 Implemented