IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

502

matching recommendations
Reset
SIC 2679 Converted Paper Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0095 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,404 $72 Not Implemented
RU0095 # 03 Y:1990 03 1990 REPAIR AND ELIMINATE STEAM LEAKS $4,881 $0 Implemented
RU0095 # 04 Y:1990 04 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,156 $375 Not Implemented
RU0095 # 05 Y:1990 05 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $454 $269 Not Implemented
RU0095 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,859 $0 Not Implemented
RU0095 # 07 Y:1990 07 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $865 $584 Not Implemented
RU0095 # 08 Y:1990 08 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,140 $4,878 Implemented
RU0068 # 01 Y:1989 01 1989 AIR CONDITION ONLY SPACE NECESSARY $5,037 $3,133 Not Implemented
RU0068 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,132 $0 Not Implemented
RU0068 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $548 $500 Implemented
RU0068 # 04 Y:1989 04 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,169 $1,912 Not Implemented
MA0158 # 01 Y:1989 01 1989 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,353 $701 Implemented
MA0158 # 02 Y:1989 02 1989 HEAT WATER WITH EXHAUST HEAT $22,335 $135,000 Not Implemented
MA0158 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,262 $838 Implemented
MA0158 # 04 Y:1989 04 1989 INSULATE BARE EQUIPMENT $3,704 $4,682 Not Implemented
MA0158 # 05 Y:1989 05 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $600 $2,000 Not Implemented
AM0058 # 01 Y:1989 01 1989 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,450 $0 Implemented
AM0058 # 02 Y:1989 02 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $280 $300 Implemented
AM0058 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $155 $0 Not Implemented
MA0127 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,207 $2,710 Implemented
MA0127 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,242 $386 Not Implemented
MA0127 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,184 $11,762 Not Implemented
MA0127 # 04 Y:1988 04 1988 INSTALL SET-BACK TIMERS $325 $446 Not Implemented
MA0127 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $872 $240 Not Implemented
MA0127 # 06 Y:1988 06 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,158 $0 Not Implemented