IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

520

matching recommendations
Reset
SIC 2679 Converted Paper Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0380 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $715 $500 Not Implemented
KU0380 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $3,220 $4,298 Implemented
KU0380 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,034 $4,860 Implemented
KU0380 # 08 Y:1992 08 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,375 $3,500 Implemented
KU0380 # 09 Y:1992 09 1992 INSTALL TURBULATORS $1,424 $1,000 Implemented
KU0380 # 10 Y:1992 10 1992 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,875 $2,500 Not Implemented
KU0380 # 11 Y:1992 11 1992 INSTALL SET-BACK TIMERS $1,153 $1,200 Not Implemented
KU0380 # 12 Y:1992 12 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8 $0 Implemented
MA0231 # 01 Y:1992 01 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $95,745 $229,893 Not Implemented
MA0231 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,364 $30,000 Not Implemented
MA0231 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $5,409 $2,790 Not Implemented
MA0231 # 04 Y:1992 04 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $3,499 $11,534 Not Implemented
MA0231 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,256 $36 Implemented
MA0231 # 06 Y:1992 06 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,652 $20,657 Not Implemented
MA0231 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,000 $0 Implemented
MA0231 # 08 Y:1992 08 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,209 $11,204 Not Implemented
MA0231 # 09 Y:1992 09 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $318 $740 Not Implemented
RU0095 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,594 $2,500 Implemented
RU0095 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,404 $72 Not Implemented
RU0095 # 03 Y:1990 03 1990 REPAIR AND ELIMINATE STEAM LEAKS $4,881 $0 Implemented
RU0095 # 04 Y:1990 04 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,156 $375 Not Implemented
RU0095 # 05 Y:1990 05 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $454 $269 Not Implemented
RU0095 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,859 $0 Not Implemented
RU0095 # 07 Y:1990 07 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $865 $584 Not Implemented
RU0095 # 08 Y:1990 08 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,140 $4,878 Implemented