Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2679 | Converted Paper Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0037 # 09 Y:1995 | 09 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,437 | $910 | Implemented |
OD0037 # 08 Y:1995 | 08 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $994 | $0 | Not Implemented |
OD0037 # 07 Y:1995 | 07 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $477 | $0 | Implemented |
OD0037 # 06 Y:1995 | 06 | 1995 | INSTALL OCCUPANCY SENSORS | $545 | $433 | Not Implemented |
OD0037 # 05 Y:1995 | 05 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,883 | $480 | Implemented |
OD0037 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,053 | $726 | Implemented |
OD0037 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,607 | $635 | Not Implemented |
OD0037 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $612 | $748 | Implemented |
OD0037 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $720 | $1,035 | Not Implemented |
WV0068 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,299 | $5,490 | Implemented |
WV0068 # 09 Y:1995 | 09 | 1995 | USE EVAPORATION TO CONCENTRATE MATERIAL | $11,456 | $5,400 | Not Implemented |
WV0068 # 03 Y:1995 | 03 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,044 | $1,240 | Implemented |
WV0068 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $271 | $295 | Implemented |
WV0068 # 05 Y:1995 | 05 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $733 | $15 | Not Implemented |
WV0068 # 06 Y:1995 | 06 | 1995 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $773 | $2,700 | Not Implemented |
WV0068 # 07 Y:1995 | 07 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $791 | $1,071 | Implemented |
WV0068 # 08 Y:1995 | 08 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,325 | $3,300 | Implemented |
WV0068 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,697 | $662 | Implemented |
MA0324 # 07 Y:1995 | 07 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $855 | $1,373 | Not Implemented |
MA0324 # 06 Y:1995 | 06 | 1995 | USE RADIANT HEATER FOR SPOT HEATING | $1,987 | $1,300 | Not Implemented |
MA0324 # 05 Y:1995 | 05 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,835 | $1,500 | Implemented |
MA0324 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,424 | $14,935 | Implemented |
MA0324 # 03 Y:1995 | 03 | 1995 | USE OPTIMUM THICKNESS INSULATION | $9,394 | $10,179 | Not Implemented |
MA0324 # 02 Y:1995 | 02 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,426 | $9,200 | Not Implemented |
MA0324 # 01 Y:1995 | 01 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $53,561 | $21,794 | Not Implemented |