IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,540

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0136 # 23 Y:1984 23 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $795 $0 Implemented
KU0137 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $3,839 $0 Implemented
KU0137 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,930 $0 Implemented
KU0137 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $50 Implemented
KU0137 # 14 Y:1984 14 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $118 $0 Implemented
CO0007 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,798 $2,178 Implemented
CO0007 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $166 $300 Implemented
CO0007 # 03 Y:1984 03 1984 RECOVER WASTE HEAT FROM EQUIPMENT $428 $100 Implemented
CO0007 # 04 Y:1984 04 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $528 $21 Implemented
CO0007 # 05 Y:1984 05 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $145 $221 Implemented
CO0007 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $288 $275 Implemented
CO0007 # 07 Y:1984 07 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,282 $0 Implemented
CO0007 # 08 Y:1984 08 1984 INSTALL TIMERS AND/OR THERMOSTATS $2,099 $721 Implemented
CO0007 # 09 Y:1984 09 1984 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $370 $400 Implemented
CO0007 # 10 Y:1984 10 1984 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,029 $25 Implemented
TS0003 # 01 Y:1984 01 1984 MINIMIZE WATER USAGE $3,197 $6 Implemented
TS0003 # 02 Y:1984 02 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,050 $1,400 Implemented
TS0003 # 05 Y:1984 05 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,190 $400 Implemented
TS0003 # 06 Y:1984 06 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,500 $500 Implemented
CO0004 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,790 $1,860 Implemented
CO0004 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $206 $320 Implemented
CO0004 # 04 Y:1984 04 1984 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $772 $240 Implemented
CO0004 # 05 Y:1984 05 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,990 $0 Implemented
CO0004 # 08 Y:1984 08 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $785 $45 Implemented
OK0141 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $233 $325 Implemented