IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,640

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0199 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,520 $28,000 Not Implemented
MS0129 # 01 Y:1999 01 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,582 $0 Not Implemented
MS0129 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,133 $479 Not Implemented
MS0129 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,721 $29,711 Not Implemented
MS0129 # 04 Y:1999 04 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,500 $3,600 Not Implemented
MS0129 # 05 Y:1999 05 1999 BURN WASTE OIL FOR HEAT $623 $1,804 Not Implemented
MS0129 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,555 $250 Implemented
MS0129 # 07 Y:1999 07 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $6,831 $7,225 Not Implemented
NV0123 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,202 $4,519 Not Implemented
NV0123 # 02 Y:1999 02 1999 USE RADIANT HEATER FOR SPOT HEATING $2,445 $4,015 Not Implemented
NV0123 # 03 Y:1999 03 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,829 $800 Not Implemented
NV0123 # 04 Y:1999 04 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $331 $170 Not Implemented
NV0123 # 05 Y:1999 05 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $500,000 $3,070,000 Not Implemented
NV0123 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,949 $164,000 Not Implemented
UF0217 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,327 $1,400 Implemented
UF0217 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $378 $3,641 Implemented
UF0217 # 03 Y:1999 03 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,574 $6,750 Not Implemented
UF0217 # 04 Y:1999 04 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $41,712 $39,500 Implemented
UF0217 # 05 Y:1999 05 1999 METER WASTE WATER $1,261 $1,500 Not Implemented
UF0217 # 06 Y:1999 06 1999 APPLY FOR INVESTMENT INCENTIVES $18,174 $50 Not Implemented
OD0127 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,954 $5,472 Implemented
OD0127 # 02 Y:1999 02 1999 SHUT OFF PILOTS IN STANDBY EQUIPMENT $477 $80 Not Implemented
OD0127 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,582 $240 Implemented
OD0127 # 04 Y:1999 04 1999 COMBINE UTILITY METERS $9,570 $5,000 Implemented
MS0127 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,685 $1,202 Implemented