Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,640
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0426 # 07 Y:2023 | 07 | 2023 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $3,449 | $1,600 | Implemented |
MI0426 # 03 Y:2023 | 03 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $11,974 | $0 | Implemented |
MI0426 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,768 | $62,963 | Not Implemented |
MI0426 # 11 Y:2023 | 11 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,774 | $205 | Not Implemented |
MI0426 # 13 Y:2023 | 13 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,450 | $2,090 | Not Implemented |
MI0426 # 05 Y:2023 | 05 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $5,093 | $4,315 | Not Implemented |
MI0426 # 10 Y:2023 | 10 | 2023 | INSTALL OCCUPANCY SENSORS | $2,010 | $1,344 | Not Implemented |
MI0426 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,177 | $1,660 | Implemented |
MI0426 # 06 Y:2023 | 06 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $4,219 | $12,866 | Not Implemented |
UW2306 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $227 | $344 | Not Implemented |
UW2306 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,231 | $0 | Not Implemented |
UW2306 # 04 Y:2023 | 04 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,916 | $6,000 | Not Implemented |
UW2306 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,732 | $2,080 | Not Implemented |
UW2306 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $9,881 | $14,306 | Not Implemented |
MZ0342 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $5,030 | $3,700 | Implemented |
MZ0342 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $570 | $120 | Implemented |
MZ0342 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $433 | $220 | Not Implemented |
MZ0342 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,266 | $5,828 | Implemented |
MZ0342 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $157 | $80 | Not Implemented |
SD0634 # 03 Y:2023 | 03 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,222 | $2,580 | Implemented |
SD0634 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,771 | $108,198 | Implemented |
SD0634 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $942 | $3,568 | Implemented |
SD0634 # 06 Y:2023 | 06 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,780 | $11,100 | Implemented |
SD0634 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $585 | $250 | Implemented |
SD0634 # 04 Y:2023 | 04 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,998 | $15,050 | Implemented |