IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

284

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0625 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,150 $17,870 Not Implemented
CO0625 # 05 Y:2009 05 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $210 Not Implemented
CO0541 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,090 $580 Not Implemented
CO0541 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $310 Not Implemented
CO0541 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $810 $350 Not Implemented
CO0541 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,670 $8,550 Not Implemented
CO0541 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,070 $560 Not Implemented
CO0541 # 07 Y:2004 07 2004 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $610 $30 Not Implemented
CO0541 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $740 $510 Not Implemented
CO0530 # 07 Y:2003 07 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $1,200 $570 Not Implemented
CO0530 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $2,940 $280 Implemented
CO0530 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,070 $7,760 Implemented
CO0530 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,370 $230 Implemented
CO0530 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,810 $1,250 Implemented
CO0530 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,370 $10,000 Implemented
CO0530 # 08 Y:2003 08 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,089,000 $4,200,000 Not Implemented
CO0530 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,830 $4,140 Not Implemented
CO0480 # 06 Y:2001 06 2001 USE OPTIMUM TEMPERATURE $500 $0 Not Implemented
CO0480 # 05 Y:2001 05 2001 USE OPTIMUM TEMPERATURE $610 $200 Not Implemented
CO0480 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30 $0 Implemented
CO0480 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,810 $1,470 Implemented
CO0480 # 07 Y:2001 07 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $460 $60 Not Implemented
CO0480 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,810 $3,750 Implemented
CO0480 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,830 $8,000 Not Implemented
CO0480 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,250 $12,950 Not Implemented