IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,640

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0211 # 09 Y:1986 09 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,017 $14,850 Implemented
OK0211 # 10 Y:1986 10 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,185 $476 Implemented
CO0070 # 01 Y:1986 01 1986 AIR CONDITION ONLY SPACE NECESSARY $6,836 $6,420 Not Implemented
CO0070 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,404 $2,400 Not Implemented
CO0070 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $1,726 $0 Implemented
CO0070 # 04 Y:1986 04 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $895 $900 Implemented
CO0070 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $558 $200 Implemented
CO0070 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $491 $150 Implemented
CO0070 # 07 Y:1986 07 1986 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $68 $25 Implemented
CO0070 # 08 Y:1986 08 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $471 $975 Not Implemented
CO0070 # 09 Y:1986 09 1986 TURN OFF EQUIPMENT WHEN NOT IN USE $372 $200 Implemented
CO0070 # 10 Y:1986 10 1986 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $118 $100 Implemented
CO0070 # 11 Y:1986 11 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $406 $158 Implemented
UD0197 # 01 Y:1986 01 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $50,748 $78,500 Implemented
UD0197 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,483 $1,804 Implemented
KU0182 # 01 Y:1986 01 1986 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $109,167 $1,000,000 Not Implemented
KU0182 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,883 $10,000 Implemented
KU0182 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,269 $20 Not Implemented
KU0182 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $418 $700 Implemented
KU0182 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $3,144 $3,000 Implemented
KU0182 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $882 $2,000 Implemented
KU0182 # 07 Y:1986 07 1986 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $801 $1,400 Not Implemented
KU0182 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $160 $0 Implemented
KU0182 # 09 Y:1986 09 1986 IMPROVE LUBRICATION PRACTICES $6,002 $4,500 Implemented
ST0048 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,259 $735 Implemented