IAC logo
IAC Assessment: CO0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1987
Principal Product IMPRINTED CHECKS & FORMS
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 23,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,822 4,336,167 kWh $0.05
Natural Gas $55,743 13,290 MMBtu $4.19
TOTAL ENERGY COSTS $267,565
RECOMMENDED SAVINGS* $33,567 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,567
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$743
Cost:
$800
$743 - - - $743
-
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$822
Cost:
$75
$822 16,999 - - $822
16,999
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,651
Cost:
$175
$106 2,052 $2,545 607 $106
2,052
kWh
$2,545
607
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$817
Cost:
$400
$817 16,706 - - $817
16,706
kWh
-
-
MMBtu
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$608
Cost:
-
$608 12,603 - - $608
12,603
kWh
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$399
Cost:
$676
$399 8,206 - - $399
8,206
kWh
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,261
Cost:
$1,500
- - $1,261 301 -
-
kWh
$1,261
301
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$22,175
Cost:
$1,682
$7,772 161,196 $14,403 3,437 $7,772
161,196
kWh
$14,403
3,437
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,091
Cost:
$2,000
$4,091 83,822 - - $4,091
83,822
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$33,567
Cost:
$7,308
$15,358 301,584 $18,209 4,345 $15,358
301,584
kWh
$18,209
4,345
MMBtu
TOTAL IMPLEMENTED Savings:
$33,567
Cost:
$7,308
$15,358 301,584 $18,209 4,345 $15,358
301,584
kWh
$18,209
4,345
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas