Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,640
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0048 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,750 | $56 | Implemented |
ST0048 # 03 Y:1985 | 03 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,126 | $0 | Implemented |
ST0048 # 04 Y:1985 | 04 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $485 | $2,598 | Implemented |
ST0048 # 05 Y:1985 | 05 | 1985 | IMPROVE LUBRICATION PRACTICES | $102 | $0 | Not Implemented |
ST0048 # 06 Y:1985 | 06 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $339 | $675 | Not Implemented |
ST0048 # 07 Y:1985 | 07 | 1985 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,311 | $0 | Not Implemented |
ST0048 # 08 Y:1985 | 08 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $335 | $22 | Implemented |
ST0048 # 09 Y:1985 | 09 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $2,371 | $700 | Not Implemented |
ST0048 # 10 Y:1985 | 10 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,899 | $2,500 | Not Implemented |
ST0048 # 11 Y:1985 | 11 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,881 | $440 | Not Implemented |
GT0272 # 01 Y:1985 | 01 | 1985 | USE HEAT PUMP FOR SPACE CONDITIONING | $3,480 | $10,000 | Not Implemented |
GT0272 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,331 | $455 | Implemented |
GT0272 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $347 | $250 | Implemented |
KU0173 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,042 | $3,793 | Implemented |
KU0173 # 02 Y:1985 | 02 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $1,572 | $1,200 | Not Implemented |
KU0173 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,053 | $1,000 | Not Implemented |
KU0173 # 04 Y:1985 | 04 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $890 | $20 | Implemented |
KU0173 # 05 Y:1985 | 05 | 1985 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $777 | $200 | Implemented |
KU0173 # 06 Y:1985 | 06 | 1985 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $549 | $1,000 | Not Implemented |
KU0173 # 07 Y:1985 | 07 | 1985 | IMPROVE LUBRICATION PRACTICES | $398 | $350 | Implemented |
KU0173 # 08 Y:1985 | 08 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $272 | $0 | Implemented |
KU0173 # 09 Y:1985 | 09 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $152 | $150 | Not Implemented |
AT0020 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $119 | $326 | Not Implemented |
AT0020 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,608 | $300 | Not Implemented |
AT0020 # 03 Y:1985 | 03 | 1985 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,714 | $7,200 | Not Implemented |