IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,640

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0097 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,219 $2,500 Implemented
IP0006 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,520 $0 Implemented
IP0006 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $980 $0 Implemented
IP0006 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $1,771 $730 Implemented
IP0006 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,847 $1,416 Not Implemented
IP0006 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $490 $1,156 Not Implemented
IP0006 # 06 Y:2012 06 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,261 $92,692 Implemented
IP0006 # 07 Y:2012 07 2012 USE DEMAND CONTROLLER OR LOAD SHEDDER $36,010 $171,310 Not Implemented
MA0701 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,785 $80,000 Not Implemented
MA0701 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $12,823 $24,111 Not Implemented
MA0701 # 03 Y:2012 03 2012 REDUCE VENTILATION AIR $3,642 $6,000 Not Implemented
MA0701 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $9,553 $47,000 Implemented
MA0701 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $7,855 $11,200 Implemented
MA0701 # 06 Y:2012 06 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,286 $500 Implemented
WV0453 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,920 $0 Implemented
WV0453 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $9,963 $2,600 Not Implemented
WV0453 # 03 Y:2012 03 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,494 $12,500 Not Implemented
WV0453 # 04 Y:2012 04 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,045 $0 Not Implemented
WV0453 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $2,222 $938 Not Implemented
WV0453 # 06 Y:2012 06 2012 INSTALL TIMERS AND/OR THERMOSTATS $1,960 $2,450 Not Implemented
WV0453 # 07 Y:2012 07 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,239 $1,000 Implemented
WV0453 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $981 $1,400 Not Implemented
WV0453 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $834 $375 Implemented
WV0453 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $753 $25 Not Implemented
WV0453 # 11 Y:2012 11 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $251 $800 Not Implemented