Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

173

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0244 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,139 $68,713 Implemented
LE0219 # 01 Y:2005 01 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,717 $1,500 Not Implemented
LE0219 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $100 Implemented
LE0219 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $80 Implemented
LE0219 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $129 $100 Implemented
LE0219 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,305 $675 Not Implemented
LE0219 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,910 $14,173 Not Implemented
SU0192 # 01 Y:2004 01 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $65,154 $9,000 Implemented
SU0192 # 02 Y:2004 02 2004 INSTALL OCCUPANCY SENSORS $3,355 $1,049 Not Implemented
SU0192 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,106 $491 Implemented
SU0192 # 04 Y:2004 04 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $217,181 $187,500 Implemented
SU0192 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $51,637 $45,000 Implemented
SU0192 # 06 Y:2004 06 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $232 $250 Implemented
LE0145 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,365 $0 Implemented
LE0145 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $929 $1,000 Not Implemented
LE0145 # 03 Y:2002 03 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,820 $0 Implemented
LE0145 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $3,018 $920 Not Implemented
LE0145 # 05 Y:2002 05 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,000 $0 Not Implemented
LE0145 # 06 Y:2002 06 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,306 $10,000 Not Implemented
LE0145 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,033 $3,718 Implemented
LE0125 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $30,715 $2,500 Not Implemented
LE0125 # 02 Y:2001 02 2001 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,926 $0 Implemented
LE0125 # 03 Y:2001 03 2001 IMPROVE LUBRICATION PRACTICES $1,126 $400 Not Implemented
LE0125 # 04 Y:2001 04 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,045 $0 Not Implemented
LE0125 # 05 Y:2001 05 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $466 $0 Implemented