Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,640
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0351 # 05 Y:2006 | 05 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,122 | $1,000 | Implemented |
WV0351 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,820 | $14 | Not Implemented |
WV0351 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,042 | $0 | Implemented |
WV0351 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,639 | $117 | Implemented |
WV0351 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,561 | $1,635 | Implemented |
WV0351 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $1,082 | $1,311 | Not Implemented |
WV0351 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $876 | $32 | Implemented |
WV0351 # 12 Y:2006 | 12 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $630 | $1,336 | Not Implemented |
WV0351 # 13 Y:2006 | 13 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $398 | $7 | Not Implemented |
UM0311 # 01 Y:2006 | 01 | 2006 | BURN WASTE PAPER FOR HEAT | $109,604 | $27,325 | Not Implemented |
UM0311 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,002 | $6,000 | Not Implemented |
UM0311 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,597 | $7,800 | Not Implemented |
UM0311 # 04 Y:2006 | 04 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,001 | $3,000 | Not Implemented |
UM0311 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,325 | $450 | Implemented |
UM0311 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,319 | $6,620 | Implemented |
UM0311 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,364 | $200 | Not Implemented |
UM0311 # 08 Y:2006 | 08 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,983 | $1,000 | Implemented |
UM0311 # 09 Y:2006 | 09 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,525 | $375 | Implemented |
UM0311 # 10 Y:2006 | 10 | 2006 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,316 | $370 | Implemented |
UM0311 # 11 Y:2006 | 11 | 2006 | INSULATE BARE EQUIPMENT | $578 | $659 | Implemented |
UM0311 # 12 Y:2006 | 12 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $101 | $63 | Not Implemented |
UU0103 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,610 | $1,995 | Not Implemented |
UU0103 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $560 | $25 | Not Implemented |
UU0103 # 03 Y:2006 | 03 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,760 | $212 | Not Implemented |
UU0103 # 04 Y:2006 | 04 | 2006 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $47,500 | $23,700 | Not Implemented |