IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0632 # 02 Y:2008 02 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,185 $17,080 Not Implemented
MA0632 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,404 $14,500 Implemented
MA0632 # 05 Y:2008 05 2008 REDUCE VENTILATION AIR $2,499 $9,000 Implemented
MA0632 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $383 $650 Implemented
MA0632 # 06 Y:2008 06 2008 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $2,149 $11,000 Not Implemented
MA0632 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,265 $4,100 Implemented
MA0632 # 03 Y:2008 03 2008 AIR CONDITION ONLY SPACE NECESSARY $4,818 $19,300 Not Implemented
HO0215 # 06 Y:2000 06 2000 $261 $200 n/a
HO0215 # 05 Y:2000 05 2000 $6,000 $12,000 n/a
HO0215 # 04 Y:2000 04 2000 $7,500 $12,000 n/a
HO0215 # 03 Y:2000 03 2000 COMBINE UTILITY METERS $4,474 $3,000 n/a
HO0215 # 02 Y:2000 02 2000 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,513 $0 n/a
HO0215 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,818 $10,083 n/a
MA0341 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $1,207 $1,440 Not Implemented
MA0341 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $469 $400 Implemented
MA0341 # 05 Y:1995 05 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $511 $711 Not Implemented
MA0341 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $721 $0 Not Implemented
MA0341 # 03 Y:1995 03 1995 COMBINE UTILITY METERS $1,091 $200 Not Implemented
MA0341 # 01 Y:1995 01 1995 PAY UTILITY BILLS ON TIME $1,707 $0 Implemented
MA0338 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,008 $0 Implemented
MA0338 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $396 $289 Implemented
MA0338 # 05 Y:1995 05 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $617 $711 Not Implemented
MA0338 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,592 $1,000 Implemented
MA0338 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,970 $0 Implemented
MA0338 # 02 Y:1995 02 1995 USE RADIANT HEATER FOR SPOT HEATING $3,469 $9,200 Implemented