IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0420 # 07 Y:1993 07 1993 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $26,098 $0 Not Implemented
UD0420 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,897 $3,000 Implemented
UD0420 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $2,456 Implemented
UD0420 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $25,572 $16,000 Implemented
UD0420 # 04 Y:1993 04 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,840 $0 Not Implemented
UD0420 # 03 Y:1993 03 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,071 $250 Not Implemented
UD0420 # 02 Y:1993 02 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $64,530 $13,000 Not Implemented
GT0513 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80 $180 n/a
GT0513 # 01 Y:1993 01 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,070 $57,930 n/a
GT0513 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $460 n/a
GT0513 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $200 $100 n/a
GT0513 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $40 $0 n/a
GT0513 # 05 Y:1993 05 1993 KEEP EQUIPMENT CLEAN $270 $25 n/a
GT0513 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,910 $7,770 n/a
GT0513 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $430 $0 n/a
OK0421 # 02 Y:1993 02 1993 REPLACE BOILER $1,806 $4,325 Not Implemented
OK0421 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $1,008 Not Implemented
OK0421 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $38 $0 Not Implemented
OK0421 # 01 Y:1993 01 1993 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,602 $11,500 Not Implemented
OK0421 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,267 $3,304 Not Implemented
OK0421 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $605 $1,242 Implemented
WI0193 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $275 $0 Not Implemented
OK0416 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,003 $7,379 Not Implemented
OK0416 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $860 $855 Not Implemented
OK0416 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $300 $1,012 Not Implemented