IAC logo
IAC Assessment: UD0420
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0420
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1993
Principal Product Flexible packaging
NAICS n/a
SIC 2754 - Commercial Printing, Gravure
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 100,000
Annual Production 0 Units
Production Hrs. Annual 6,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $297,367 4,704,865 kWh $0.06
Natural Gas $210,642 40,650 MMBtu $5.18
TOTAL ENERGY COSTS $508,009
RECOMMENDED SAVINGS* $137,056 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,517
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$25,572
Cost:
$16,000
$25,572 - - - $25,572
-
kWh
-
-
MMBtu
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$64,530
Cost:
$13,000
$64,530 - - - $64,530
-
kWh
-
-
MMBtu
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$14,071
Cost:
$250
$14,071 - - - $14,071
-
kWh
-
-
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,840
Cost:
-
$1,840 - - - $1,840
-
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,048
Cost:
$2,456
$1,048 - - - $1,048
-
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,897
Cost:
$3,000
- - $3,897 782 -
-
kWh
$3,897
782
MMBtu
07: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$26,098
Cost:
-
- - $26,098 4,620 -
-
kWh
$26,098
4,620
MMBtu
TOTAL RECOMMENDED Savings:
$137,056
Cost:
$34,706
$107,061 - $29,995 5,402 $107,061
-
kWh
$29,995
5,402
MMBtu
TOTAL IMPLEMENTED Savings:
$30,517
Cost:
$21,456
$26,620 - $3,897 782 $26,620
-
kWh
$3,897
782
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas