Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
273
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NV0044 # 04 Y:1995 | 04 | 1995 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $903 | $911 | Not Implemented |
NV0044 # 03 Y:1995 | 03 | 1995 | INSTALL OCCUPANCY SENSORS | $1,544 | $736 | Not Implemented |
NV0044 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,457 | $978 | Implemented |
NV0044 # 05 Y:1995 | 05 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,151 | $4,335 | Implemented |
NV0044 # 01 Y:1995 | 01 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,702 | $175 | Implemented |
WI0255 # 05 Y:1995 | 05 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,060 | $0 | n/a |
WI0255 # 11 Y:1995 | 11 | 1995 | RECOVER AND REUSE WASTE MATERIAL | $1,150 | $0 | n/a |
WI0255 # 04 Y:1995 | 04 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,521 | $0 | n/a |
WI0255 # 09 Y:1995 | 09 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $615 | $0 | n/a |
WI0255 # 06 Y:1995 | 06 | 1995 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $1,281 | $3,600 | n/a |
WI0255 # 10 Y:1995 | 10 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,100 | $0 | n/a |
WI0255 # 02 Y:1995 | 02 | 1995 | INSTALL OCCUPANCY SENSORS | $1,141 | $300 | n/a |
WI0255 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,156 | $4,639 | n/a |
WI0255 # 08 Y:1995 | 08 | 1995 | USE OPTIMUM THICKNESS INSULATION | $671 | $1,067 | n/a |
WI0255 # 07 Y:1995 | 07 | 1995 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $808 | $950 | n/a |
WI0255 # 03 Y:1995 | 03 | 1995 | SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON | $2,897 | $6,500 | n/a |
WI0250 # 05 Y:1995 | 05 | 1995 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $5,930 | $20,000 | Not Implemented |
WI0250 # 06 Y:1995 | 06 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,770 | $0 | Not Implemented |
WI0250 # 03 Y:1995 | 03 | 1995 | INSTALL OCCUPANCY SENSORS | $440 | $300 | Not Implemented |
WI0250 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $162 | $0 | Implemented |
WI0250 # 01 Y:1995 | 01 | 1995 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,196 | $0 | Not Implemented |
WI0250 # 02 Y:1995 | 02 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,543 | $2,000 | Implemented |
OK0478 # 02 Y:1995 | 02 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,374 | $48,000 | Implemented |
OK0478 # 06 Y:1995 | 06 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,382 | $1,650 | Not Implemented |
OK0478 # 05 Y:1995 | 05 | 1995 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,792 | $160 | Not Implemented |