Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
110
matching recommendationsSIC | 27 | Printing And Publishing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0332 # 05 Y:2003 | 05 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,090 | $1,060 | Implemented |
UF0332 # 06 Y:2003 | 06 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $6,954 | $42,000 | Implemented |
UF0332 # 01 Y:2003 | 01 | 2003 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $20,678 | $12,800 | Not Implemented |
UF0332 # 02 Y:2003 | 02 | 2003 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $15,627 | $1,500 | Not Implemented |
UF0332 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $676 | $803 | Implemented |
UF0332 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,350 | $4,928 | Not Implemented |
SU0167 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,750 | $214 | Not Implemented |
SU0167 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,319 | $5,775 | Not Implemented |
SU0167 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $603 | $116 | Not Implemented |
SU0167 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $839 | $0 | Implemented |
SU0167 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $633 | $0 | Not Implemented |
SU0167 # 03 Y:2003 | 03 | 2003 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $8,152 | $147 | Not Implemented |
CO0530 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,370 | $230 | Implemented |
CO0530 # 08 Y:2003 | 08 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $4,089,000 | $4,200,000 | Not Implemented |
CO0530 # 07 Y:2003 | 07 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,200 | $570 | Not Implemented |
CO0530 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,810 | $1,250 | Implemented |
CO0530 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $1,830 | $4,140 | Not Implemented |
CO0530 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,070 | $7,760 | Implemented |
CO0530 # 03 Y:2003 | 03 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $2,940 | $280 | Implemented |
CO0530 # 01 Y:2003 | 01 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $13,370 | $10,000 | Implemented |
UU0052 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,035 | $134 | n/a |
UU0052 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $12,731 | $22,600 | n/a |
UU0052 # 05 Y:2003 | 05 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,027 | $6,000 | n/a |
UU0052 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,302 | $1,661 | n/a |
UU0052 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,186 | $2,810 | n/a |