IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0828 # 06 Y:2010 06 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,796 $62,106 Implemented
UD0828 # 04 Y:2010 04 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $86,333 $28,000 Not Implemented
UD0828 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,598 $500 Not Implemented
UD0828 # 09 Y:2010 09 2010 UPGRADE CONTROLS ON COMPRESSORS $6,407 $2,100 Not Implemented
UD0828 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,431 $1,200 Implemented
UD0828 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,272 $14,000 Not Implemented
UD0828 # 10 Y:2010 10 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,710 $500 Implemented
UD0828 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $28,346 $12,800 Not Implemented
UD0828 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,693 $2,405 Not Implemented
UD0828 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,066 $5,000 Not Implemented
UD0828 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,599 $2,599 Not Implemented
UD0828 # 16 Y:2010 16 2010 RECOVER WASTE HEAT FROM EQUIPMENT $52,035 $62,500 Not Implemented
UD0828 # 18 Y:2010 18 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,601 $25 Not Implemented
UD0828 # 17 Y:2010 17 2010 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $15,589 $35,000 Not Implemented
UD0828 # 13 Y:2010 13 2010 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $16,653 $25 Implemented
UD0828 # 14 Y:2010 14 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,308 $25 Not Implemented
UD0828 # 15 Y:2010 15 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $990 $250 Not Implemented
UD0828 # 02 Y:2010 02 2010 DISCONNECT BALLASTS $4,524 $550 Not Implemented
IC0179 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $626 Implemented
IC0179 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,072 $34,800 Not Implemented
IC0179 # 07 Y:2010 07 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $357 $0 Not Implemented
IC0179 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,064 $3,510 Not Implemented
IC0179 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203 $82 Implemented
IC0179 # 02 Y:2010 02 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,268 $0 Not Implemented
IC0179 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $389 $2,833 Implemented