IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0537 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,593 $8,768 Implemented
AS0537 # 02 Y:2022 02 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,397 $1,327 Implemented
AS0537 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $400 $11 Implemented
AS0537 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $151 $394 Implemented
AS0537 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $475 $250 Implemented
SU0528 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,305 $875 Not Implemented
SU0528 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $650 $1,804 Not Implemented
SU0528 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $189 $115 Not Implemented
SU0528 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $6,434 $414 Not Implemented
SU0528 # 05 Y:2022 05 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,343 $660 Not Implemented
SU0528 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $276 $0 Not Implemented
SU0528 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,193 $100 Not Implemented
SU0528 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,262 $0 Not Implemented
SU0528 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,717 $2,594 Not Implemented
CM1008 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $81,100 $8,000 n/a
CM1008 # 05 Y:2022 05 2022 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $4,470 $0 n/a
CM1008 # 04 Y:2022 04 2022 INCREASE EFFICIENCY OF TRUCKS $25,700 $77,000 n/a
CM1008 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,000 $43,000 n/a
CM1008 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,300 $440 n/a
UF0586 # 02 Y:2022 02 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,066 $12,420 Implemented
UF0586 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,260 $6,608 Not Implemented
UF0586 # 06 Y:2022 06 2022 IMPROVE SPACE COMFORT CONDITIONING $24,960 $4,480 Implemented
UF0586 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,260 $25,400 Implemented
UF0586 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $86,172 $297,040 Not Implemented
UF0586 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,306 $9,876 Implemented