IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 271 Newspapers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0121 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,700 $0 Not Implemented
DL0121 # 03 Y:2014 03 2014 AIR CONDITION ONLY SPACE NECESSARY $22,620 $750 Not Implemented
DL0121 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,400 $13,500 Not Implemented
DL0121 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,400 $28,000 Not Implemented
DL0121 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,750 $1,300 Not Implemented
DL0121 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,960 $1,400 Not Implemented
DL0121 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $3,460 $3,210 Not Implemented
DL0121 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,200 $18,600 Not Implemented
DL0121 # 10 Y:2014 10 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,830 $0 Not Implemented
DL0121 # 01 Y:2014 01 2014 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $31,300 $0 Not Implemented
WV0081 # 10 Y:1996 10 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,768 $245 Implemented
WV0081 # 09 Y:1996 09 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $258 $200 Implemented
WV0081 # 08 Y:1996 08 1996 DIRECT WARMEST AIR TO COMBUSTION INTAKE $239 $826 Not Implemented
WV0081 # 07 Y:1996 07 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $457 $555 Not Implemented
WV0081 # 06 Y:1996 06 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $494 $1,427 Not Implemented
WV0081 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,452 $90 Implemented
WV0081 # 04 Y:1996 04 1996 USE SYNTHETIC LUBRICANT $890 $990 Implemented
WV0081 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,653 $920 Not Implemented
WV0081 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $492 $160 Implemented
WV0081 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $730 $837 Implemented