Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1996 |
Principal Product | Newspaper |
NAICS | n/a |
SIC | 2711 - Newspapers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 290 |
Plant Area (Sq.Ft.) | 75,000 |
Annual Production | 10,400 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $89,542 | 2,480,950 | kWh | $0.04 |
Electricity Demand | $26,961 | 5,424 | kW-months/year | $4.97 |
Electricity Fees | $9,132 | - | $ | - |
Natural Gas | $9,119 | 1,374 | MMBtu | $6.64 |
TOTAL ENERGY COSTS | $134,754 | |||
RECOMMENDED SAVINGS* | $9,433 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,590 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Primary Raw Material | Electricity Usage | Natural Gas | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $730 Cost: $837 |
$730 | 19,050 | - | - | - | - |
$730 19,050 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $492 Cost: $160 |
$492 | 12,896 | - | - | - | - |
$492 12,896 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,653 Cost: $920 |
$1,653 | 43,376 | - | - | - | - |
$1,653 43,376 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $890 Cost: $990 |
$890 | 23,154 | - | - | - | - |
$890 23,154 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,452 Cost: $90 |
$2,452 | 64,185 | - | - | - | - |
$2,452 64,185 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $494 Cost: $1,427 |
$494 | 12,896 | - | - | - | - |
$494 12,896 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $457 Cost: $555 |
- | - | $457 | 68 | - | - |
- - kWh |
$457 68 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $239 Cost: $826 |
- | - | $239 | 36 | - | - |
- - kWh |
$239 36 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $258 Cost: $200 |
- | - | $258 | 39 | - | - |
- - kWh |
$258 39 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $1,768 Cost: $245 |
- | - | - | - | $1,768 | - |
- - kWh |
- - MMBtu |
$1,768 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $9,433 Cost: $6,250 |
$6,711 | 175,557 | $954 | 143 | $1,768 | - | $6,711 175,557 kWh |
$954 143 MMBtu |
$1,768 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,590 Cost: $2,522 |
$4,564 | 119,285 | $258 | 39 | $1,768 | - | $4,564 119,285 kWh |
$258 39 MMBtu |
$1,768 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Primary Raw Material | Electricity Usage | Natural Gas | Primary Raw Material |