IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,080

matching recommendations
Reset
SIC 2711 Newspapers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0255 # 03 Y:2003 03 2003 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $7,212 $5,250 Not Implemented
SF0255 # 04 Y:2003 04 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,226 $3,400 Implemented
SF0255 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,416 $13,464 Not Implemented
SF0255 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $3,302 $7,220 Not Implemented
SF0255 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $353 $796 Implemented
SF0255 # 08 Y:2003 08 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,337 $587 Not Implemented
SF0255 # 09 Y:2003 09 2003 OPTIMIZE PLANT POWER FACTOR $678 $1,749 Not Implemented
UF0316 # 01 Y:2003 01 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $6,710 $5,529 Not Implemented
UF0316 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,048 $39,293 Not Implemented
UF0316 # 03 Y:2003 03 2003 INSTALL SKYLIGHTS $2,373 $4,104 Not Implemented
UF0316 # 04 Y:2003 04 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,100 $1,073 Not Implemented
UF0316 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $993 $0 Implemented
UF0316 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,383 $340 Implemented
UF0316 # 07 Y:2003 07 2003 DEVELOP A REPAIR/REPLACE POLICY $4,496 $4,860 Not Implemented
UF0316 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,247 $0 Not Implemented
UF0316 # 09 Y:2003 09 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,064 $5,000 Implemented
UF0316 # 10 Y:2003 10 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,300 $41,637 Implemented
UF0316 # 11 Y:2003 11 2003 OPTIMIZE PLANT POWER FACTOR $15,362 $9,000 Not Implemented
UF0316 # 12 Y:2003 12 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,000 $0 Not Implemented
UF0315 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,085 $353 Implemented
UF0315 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,831 $4,121 Implemented
UF0315 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $903 $3,000 Not Implemented
UF0315 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,378 $0 Not Implemented
UF0315 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,039 $1,906 Implemented
UF0315 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $3,905 $1,281 Not Implemented