Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 2711 | Newspapers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0068 # 01 Y:2011 | 01 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,373 | $1,770 | Implemented |
MZ0068 # 02 Y:2011 | 02 | 2011 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $229 | $660 | Implemented |
MZ0068 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12 | $60 | Implemented |
MZ0068 # 04 Y:2011 | 04 | 2011 | REDUCE HEAT GAIN BY WINDOW TINTING | $838 | $950 | Not Implemented |
MZ0068 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $790 | $2,110 | Implemented |
MZ0068 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $333 | $0 | Implemented |
MZ0068 # 07 Y:2011 | 07 | 2011 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $31 | $0 | Implemented |
MZ0068 # 08 Y:2011 | 08 | 2011 | CLEAR AND RENT EXISTING SPACE | $17,500 | $0 | Not Implemented |
MZ0074 # 08 Y:2011 | 08 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,230 | $1,000 | Not Implemented |
MZ0074 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,976 | $820 | Implemented |
MZ0074 # 02 Y:2011 | 02 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $515 | $0 | Implemented |
MZ0074 # 03 Y:2011 | 03 | 2011 | REDUCE HEAT GAIN BY WINDOW TINTING | $409 | $554 | Implemented |
MZ0074 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,134 | $18,500 | Implemented |
MZ0074 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $81 | $170 | Implemented |
MZ0074 # 06 Y:2011 | 06 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $110 | $0 | Implemented |
MZ0074 # 07 Y:2011 | 07 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,840 | $0 | Implemented |
MO0111 # 09 Y:1994 | 09 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,202 | $445 | Not Implemented |
MO0111 # 11 Y:1994 | 11 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $492 | $400 | Not Implemented |
MO0111 # 10 Y:1994 | 10 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $954 | $60 | Not Implemented |
MO0111 # 08 Y:1994 | 08 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,833 | $4,453 | Not Implemented |
MO0111 # 07 Y:1994 | 07 | 1994 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,375 | $90 | Implemented |
MO0111 # 06 Y:1994 | 06 | 1994 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $1,721 | $5,100 | Not Implemented |
MO0111 # 05 Y:1994 | 05 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,308 | $209 | Implemented |
MO0111 # 04 Y:1994 | 04 | 1994 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $2,700 | $1,800 | Not Implemented |
MO0111 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $220 | $460 | Implemented |