IAC Assessment: MZ0074
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0074
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2011
Principal Product printing services
NAICS 511110 - Newspaper Publishers
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 230
Plant Area (Sq.Ft.) 145,000
Annual Production 1,200 Tons
Production Hrs. Annual 7,920
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,124 3,181,495 kWh $0.04
Electricity Demand $141,384 8,220 kW-months/year $17.20
Natural Gas $20,419 1,712 MMBtu $11.93
TOTAL ENERGY COSTS $290,927
RECOMMENDED SAVINGS* $59,295 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,065
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,976
Cost:
$820
$2,790 69,750 $2,186 127 $2,790
69,750
kWh
$2,186
127
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$515
Cost:
-
$515 12,884 - - $515
12,884
kWh
-
-
kW-months/year
03: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$409
Cost:
$554
$409 10,266 - - $409
10,266
kWh
-
-
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,134
Cost:
$18,500
$9,134 228,355 - - $9,134
228,355
kWh
-
-
kW-months/year
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$81
Cost:
$170
$81 2,028 - - $81
2,028
kWh
-
-
kW-months/year
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$110
Cost:
-
$110 2,738 - - $110
2,738
kWh
-
-
kW-months/year
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$22,840
Cost:
-
$22,840 571,066 - - $22,840
571,066
kWh
-
-
kW-months/year
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$21,230
Cost:
$1,000
- - $21,230 1,234 -
-
kWh
$21,230
1,234
kW-months/year
TOTAL RECOMMENDED Savings:
$59,295
Cost:
$21,044
$35,879 897,087 $23,416 1,361 $35,879
897,087
kWh
$23,416
1,361
kW-months/year
TOTAL IMPLEMENTED Savings:
$38,065
Cost:
$20,044
$35,879 897,087 $2,186 127 $35,879
897,087
kWh
$2,186
127
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand