IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 2711 Newspapers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0828 # 10 Y:2010 10 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,710 $500 Implemented
UD0828 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,599 $2,599 Not Implemented
UD0828 # 02 Y:2010 02 2010 DISCONNECT BALLASTS $4,524 $550 Not Implemented
UD0828 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $2,693 $2,405 Not Implemented
UD0828 # 04 Y:2010 04 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $86,333 $28,000 Not Implemented
UD0828 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $28,346 $12,800 Not Implemented
UD0828 # 06 Y:2010 06 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,796 $62,106 Implemented
UD0828 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,431 $1,200 Implemented
UD0828 # 08 Y:2010 08 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,272 $14,000 Not Implemented
UD0828 # 09 Y:2010 09 2010 UPGRADE CONTROLS ON COMPRESSORS $6,407 $2,100 Not Implemented
UD0828 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,598 $500 Not Implemented
UD0828 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,066 $5,000 Not Implemented
UD0828 # 13 Y:2010 13 2010 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $16,653 $25 Implemented
UD0828 # 14 Y:2010 14 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,308 $25 Not Implemented
UD0828 # 15 Y:2010 15 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $990 $250 Not Implemented
UD0828 # 16 Y:2010 16 2010 RECOVER WASTE HEAT FROM EQUIPMENT $52,035 $62,500 Not Implemented
UD0828 # 17 Y:2010 17 2010 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $15,589 $35,000 Not Implemented
UD0828 # 18 Y:2010 18 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,601 $25 Not Implemented
LL0336 # 02 Y:2010 02 2010 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $15,990 $5,455 Not Implemented
LL0336 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,938 $6,840 Implemented
LL0336 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,848 $1,290 Not Implemented
LL0336 # 04 Y:2010 04 2010 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,008 $630 Implemented
LL0336 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,947 $2,100 Implemented
LL0336 # 06 Y:2010 06 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,072 $1,336 Not Implemented
LL0336 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $392 $245 Not Implemented