Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsSIC | 273 | Books |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MO0173 # 06 Y:1996 | 06 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,473 | $80 | Implemented |
MO0173 # 07 Y:1996 | 07 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,688 | $112 | Implemented |
MO0173 # 08 Y:1996 | 08 | 1996 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $267 | $120 | Implemented |
MO0173 # 09 Y:1996 | 09 | 1996 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $1,155 | $0 | Implemented |
KU0252 # 06 Y:1988 | 06 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $308 | $0 | Implemented |
KU0252 # 01 Y:1988 | 01 | 1988 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,182 | $7,500 | Implemented |
KU0252 # 02 Y:1988 | 02 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,238 | $200 | Implemented |
KU0252 # 03 Y:1988 | 03 | 1988 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,500 | $3,600 | Not Implemented |
KU0252 # 04 Y:1988 | 04 | 1988 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,095 | $1,200 | Not Implemented |
KU0252 # 12 Y:1988 | 12 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,191 | $0 | Implemented |
KU0252 # 11 Y:1988 | 11 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $137 | $0 | Implemented |
KU0252 # 10 Y:1988 | 10 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $147 | $0 | Not Implemented |
KU0252 # 09 Y:1988 | 09 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $167 | $200 | Not Implemented |
KU0252 # 08 Y:1988 | 08 | 1988 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $414 | $0 | Implemented |
KU0252 # 07 Y:1988 | 07 | 1988 | INSTALL SET-BACK TIMERS | $1,072 | $324 | Implemented |
KU0252 # 05 Y:1988 | 05 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,381 | $0 | Implemented |
KU0239 # 02 Y:1987 | 02 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $516 | $0 | Not Implemented |
KU0239 # 08 Y:1987 | 08 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $143 | $0 | Implemented |
KU0239 # 03 Y:1987 | 03 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $392 | $0 | Implemented |
KU0239 # 04 Y:1987 | 04 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $410 | $79 | Implemented |
KU0239 # 05 Y:1987 | 05 | 1987 | INSTALL TURBULATORS | $318 | $500 | Not Implemented |
KU0239 # 06 Y:1987 | 06 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $222 | $50 | Implemented |
KU0239 # 07 Y:1987 | 07 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $172 | $50 | Not Implemented |
KU0239 # 01 Y:1987 | 01 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $5,811 | $300 | Implemented |