IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 273 Books
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0173 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,473 $80 Implemented
MO0173 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,688 $112 Implemented
MO0173 # 08 Y:1996 08 1996 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $267 $120 Implemented
MO0173 # 09 Y:1996 09 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,155 $0 Implemented
KU0252 # 06 Y:1988 06 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $308 $0 Implemented
KU0252 # 01 Y:1988 01 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,182 $7,500 Implemented
KU0252 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,238 $200 Implemented
KU0252 # 03 Y:1988 03 1988 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,500 $3,600 Not Implemented
KU0252 # 04 Y:1988 04 1988 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,095 $1,200 Not Implemented
KU0252 # 12 Y:1988 12 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,191 $0 Implemented
KU0252 # 11 Y:1988 11 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $137 $0 Implemented
KU0252 # 10 Y:1988 10 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $147 $0 Not Implemented
KU0252 # 09 Y:1988 09 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $167 $200 Not Implemented
KU0252 # 08 Y:1988 08 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $414 $0 Implemented
KU0252 # 07 Y:1988 07 1988 INSTALL SET-BACK TIMERS $1,072 $324 Implemented
KU0252 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,381 $0 Implemented
KU0239 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $516 $0 Not Implemented
KU0239 # 08 Y:1987 08 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $143 $0 Implemented
KU0239 # 03 Y:1987 03 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $392 $0 Implemented
KU0239 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $79 Implemented
KU0239 # 05 Y:1987 05 1987 INSTALL TURBULATORS $318 $500 Not Implemented
KU0239 # 06 Y:1987 06 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $222 $50 Implemented
KU0239 # 07 Y:1987 07 1987 RECOVER WASTE HEAT FROM EQUIPMENT $172 $50 Not Implemented
KU0239 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $5,811 $300 Implemented