Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 273 | Books |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0252 # 12 Y:1988 | 12 | 1988 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,191 | $0 | Implemented |
KU0252 # 11 Y:1988 | 11 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $137 | $0 | Implemented |
KU0252 # 10 Y:1988 | 10 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $147 | $0 | Not Implemented |
KU0252 # 09 Y:1988 | 09 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $167 | $200 | Not Implemented |
KU0252 # 08 Y:1988 | 08 | 1988 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $414 | $0 | Implemented |
KU0252 # 07 Y:1988 | 07 | 1988 | INSTALL SET-BACK TIMERS | $1,072 | $324 | Implemented |
KU0252 # 06 Y:1988 | 06 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $308 | $0 | Implemented |
KU0252 # 05 Y:1988 | 05 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,381 | $0 | Implemented |
KU0252 # 01 Y:1988 | 01 | 1988 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,182 | $7,500 | Implemented |
KU0252 # 02 Y:1988 | 02 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,238 | $200 | Implemented |
KU0252 # 03 Y:1988 | 03 | 1988 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,500 | $3,600 | Not Implemented |
KU0252 # 04 Y:1988 | 04 | 1988 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,095 | $1,200 | Not Implemented |
KU0244 # 02 Y:1988 | 02 | 1988 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,665 | $0 | Implemented |
KU0244 # 09 Y:1988 | 09 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $114 | $0 | Implemented |
KU0244 # 08 Y:1988 | 08 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $174 | $10 | Not Implemented |
KU0244 # 07 Y:1988 | 07 | 1988 | INSTALL AUTOMATIC STACK DAMPER | $178 | $275 | Implemented |
KU0244 # 06 Y:1988 | 06 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $324 | $0 | Implemented |
KU0244 # 05 Y:1988 | 05 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $404 | $125 | Implemented |
KU0244 # 04 Y:1988 | 04 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,359 | $2,400 | Implemented |
KU0244 # 03 Y:1988 | 03 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,434 | $2,355 | Not Implemented |
KU0244 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,442 | $9,509 | Implemented |
GT0336 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,025 | $19,500 | Implemented |
GT0336 # 02 Y:1988 | 02 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $228 | $228 | Not Implemented |
GT0336 # 03 Y:1988 | 03 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,130 | $0 | Implemented |
GT0336 # 04 Y:1988 | 04 | 1988 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $5,790 | $1,600 | Not Implemented |