IAC logo
IAC Assessment: GT0336
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0336
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1988
Principal Product COLOR OFFSET PRINTING
NAICS n/a
SIC 2732 - Book Printing
Sales $10,000,000-$50,000,000
# of Employees 194
Plant Area (Sq.Ft.) 0
Annual Production 27,000,000 Pounds
Production Hrs. Annual 4,896
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $313,391 5,957,796 kWh $0.05
Natural Gas $13,723 1,671 MMBtu $8.21
TOTAL ENERGY COSTS $327,114
RECOMMENDED SAVINGS* $15,783 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,765
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,025
Cost:
$19,500
$6,025 116,354 $6,025
116,354
kWh
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$228
Cost:
$228
$228 4,396 $228
4,396
kWh
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,130
Cost:
-
$1,130 21,688 $1,130
21,688
kWh
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$5,790
Cost:
$1,600
$5,790 125,147 $5,790
125,147
kWh
05: 2.5194 REDESIGN PROCESS Savings:
$2,610
Cost:
$2,100
$2,610 21,395 $2,610
21,395
kWh
TOTAL RECOMMENDED Savings:
$15,783
Cost:
$23,428
$15,783 288,980 $15,783
288,980
kWh
TOTAL IMPLEMENTED Savings:
$9,765
Cost:
$21,600
$9,765 159,437 $9,765
159,437
kWh