Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,351
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0046 # 04 Y:2025 | 04 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,341 | $6,080 | n/a |
NT0046 # 05 Y:2025 | 05 | 2025 | INSTALL SET-BACK TIMERS | $1,557 | $0 | n/a |
NT0046 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $1,581 | $9,420 | n/a |
NT0046 # 02 Y:2025 | 02 | 2025 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $13,917 | $55,150 | n/a |
NT0046 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,383 | $5,609 | n/a |
NL0106 # 05 Y:2024 | 05 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,863 | $25 | n/a |
NL0106 # 03 Y:2024 | 03 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,899 | $2,000 | n/a |
NL0106 # 04 Y:2024 | 04 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $2,086 | $675 | n/a |
NL0106 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $398 | $100 | n/a |
NL0106 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203 | $303 | n/a |
NL0106 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,713 | $5,826 | n/a |
NL0106 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,202 | $125 | n/a |
UF0626 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $75,600 | $740 | n/a |
UF0626 # 11 Y:2024 | 11 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $25,597 | $60,000 | n/a |
UF0626 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,328 | $1,140 | n/a |
UF0626 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,871 | $0 | n/a |
UF0626 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,710 | $322,608 | n/a |
UF0626 # 08 Y:2024 | 08 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $1,107 | $280 | n/a |
UF0626 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,036 | $15,920 | n/a |
UF0626 # 10 Y:2024 | 10 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $57,669 | $2,320 | n/a |
UF0626 # 05 Y:2024 | 05 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,655 | $12,290 | n/a |
UF0626 # 07 Y:2024 | 07 | 2024 | REDESIGN PROCESS | $1,168 | $4,600 | n/a |
UF0626 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $41,281 | $36,971 | n/a |
IC0319 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $275 | $0 | n/a |
IC0319 # 03 Y:2025 | 03 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $8,428 | $0 | n/a |