IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,451

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0316 # 07 Y:1994 07 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $475 $312 Implemented
MA0316 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,576 $0 Implemented
MA0316 # 04 Y:1994 04 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,618 $685 Implemented
NV0009 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,106 $1,200 Implemented
NV0009 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,838 $100 Implemented
NV0009 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,542 $25,047 Implemented
NV0009 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,646 $2,200 Implemented
NV0009 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $2,237 $80 Implemented
NV0009 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,600 $0 Implemented
UD0438 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,133 $30,000 Implemented
UD0438 # 03 Y:1994 03 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $14,232 $27,000 Implemented
UD0438 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,413 $1,088 Implemented
UD0438 # 07 Y:1994 07 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $549 $0 Implemented
SF0034 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,729 $7,007 Implemented
SF0034 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,330 $1,862 Implemented
SF0034 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,567 $17,310 Implemented
SF0034 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,999 $900 Implemented
MO0127 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,858 $17,300 Implemented
MO0127 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $180 Implemented
MO0127 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $171 $275 Implemented
MO0127 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,393 $8,118 Implemented
MO0127 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,433 $140 Implemented
MO0127 # 08 Y:1994 08 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $523 $75 Implemented
UD0436 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $11,729 $21,000 Implemented
UD0436 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $4,381 $7,000 Implemented