IAC Assessment: SF0034
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0034
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1994
Principal Product Advertisement Inserts
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 90,000
Annual Production 45,000 Tons
Production Hrs. Annual 8,640
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $782,570 8,007,620 kWh $0.10
Natural Gas $364,820 86,806 MMBtu $4.20
TOTAL ENERGY COSTS $1,147,390
RECOMMENDED SAVINGS* $88,909 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,625
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,480
Cost:
$11,289
$6,480 - - - $6,480
-
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,729
Cost:
$7,007
$8,729 89,390 - - $8,729
89,390
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,330
Cost:
$1,862
$2,330 23,740 - - $2,330
23,740
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,567
Cost:
$17,310
$22,567 230,950 - - $22,567
230,950
kWh
-
-
MMBtu
05: 2.7145 INSTALL SKYLIGHTS Savings:
$8,677
Cost:
$28,600
$8,677 88,804 - - $8,677
88,804
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,539
Cost:
$750
$5,539 56,565 - - $5,539
56,565
kWh
-
-
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$15,345
Cost:
$1,600
$15,345 157,093 - - $15,345
157,093
kWh
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,999
Cost:
$900
$11,999 122,802 - - $11,999
122,802
kWh
-
-
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,517
Cost:
$2,939
- - $5,517 1,314 -
-
kWh
$5,517
1,314
MMBtu
10: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,726
Cost:
$1,191
$1,726 17,585 - - $1,726
17,585
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$88,909
Cost:
$73,448
$83,392 786,929 $5,517 1,314 $83,392
786,929
kWh
$5,517
1,314
MMBtu
TOTAL IMPLEMENTED Savings:
$45,625
Cost:
$27,079
$45,625 466,882 - - $45,625
466,882
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas