IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0127 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $180 Implemented
MO0127 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $171 $275 Implemented
MO0127 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,393 $8,118 Implemented
MO0127 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,433 $140 Implemented
MO0127 # 08 Y:1994 08 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $523 $75 Implemented
KU0282 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,973 $270 Implemented
KU0282 # 04 Y:1989 04 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,121 $670 Implemented
KU0282 # 06 Y:1989 06 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $319 $82 Implemented
KU0282 # 07 Y:1989 07 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $329 $50 Implemented
KU0282 # 08 Y:1989 08 1989 REDUCE OR ELIMINATE WASTE $800 $50 Implemented
KU0229 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,296 $6,510 Implemented
KU0229 # 02 Y:1987 02 1987 INSTALL TIMERS AND/OR THERMOSTATS $1,678 $8,000 Implemented
KU0229 # 06 Y:1987 06 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $672 $0 Implemented
KU0182 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,883 $10,000 Implemented
KU0182 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $418 $700 Implemented
KU0182 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $3,144 $3,000 Implemented
KU0182 # 06 Y:1986 06 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $882 $2,000 Implemented
KU0182 # 08 Y:1986 08 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $160 $0 Implemented
KU0182 # 09 Y:1986 09 1986 IMPROVE LUBRICATION PRACTICES $6,002 $4,500 Implemented
KU0146 # 02 Y:1984 02 1984 USE OPTIMUM THICKNESS INSULATION $8,162 $450 Implemented
KU0146 # 07 Y:1984 07 1984 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,653 $75 Implemented
KU0146 # 08 Y:1984 08 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,085 $12,000 Implemented
KU0146 # 10 Y:1984 10 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $345 $137 Implemented
KU0146 # 11 Y:1984 11 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $25 Implemented
KU0146 # 12 Y:1984 12 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $200 $275 Implemented