IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0426 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,373 $2,640 Not Implemented
MI0426 # 03 Y:2023 03 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,974 $0 Implemented
MI0426 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,768 $62,963 Not Implemented
MI0426 # 11 Y:2023 11 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,774 $205 Not Implemented
MI0426 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,177 $1,660 Implemented
MI0426 # 13 Y:2023 13 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,450 $2,090 Not Implemented
MI0426 # 06 Y:2023 06 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $4,219 $12,866 Not Implemented
MI0426 # 12 Y:2023 12 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,713 $6,180 Not Implemented
MI0426 # 14 Y:2023 14 2023 SHADE WINDOWS FROM SUMMER SUN $1,001 $1,664 Not Implemented
MI0426 # 10 Y:2023 10 2023 INSTALL OCCUPANCY SENSORS $2,010 $1,344 Not Implemented
MI0426 # 05 Y:2023 05 2023 AIR CONDITION ONLY SPACE NECESSARY $5,093 $4,315 Not Implemented
MI0426 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $31,593 $0 Implemented
MI0426 # 07 Y:2023 07 2023 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $3,449 $1,600 Implemented
MI0426 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,404 $630 Implemented
UF0586 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $86,172 $297,040 Not Implemented
UF0586 # 02 Y:2022 02 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,066 $12,420 Implemented
UF0586 # 06 Y:2022 06 2022 IMPROVE SPACE COMFORT CONDITIONING $24,960 $4,480 Implemented
UF0586 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,260 $25,400 Implemented
UF0586 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,306 $9,876 Implemented
UF0586 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,260 $6,608 Not Implemented
UF0569 # 11 Y:2021 11 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,822 $0 Implemented
UF0569 # 10 Y:2021 10 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,868 $0 Implemented
UF0569 # 05 Y:2021 05 2021 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $11,660 $40,000 Not Implemented
UF0569 # 09 Y:2021 09 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,071 $495 Implemented
UF0569 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,828 $23,023 Implemented