IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0072 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $438 $0 Implemented
MZ0072 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,745 $19,300 Implemented
MZ0072 # 12 Y:2012 12 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,620 $0 Implemented
MZ0072 # 06 Y:2012 06 2012 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $8,585 $4,500 Implemented
MZ0072 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $2,639 $180 Implemented
MZ0072 # 11 Y:2012 11 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,058 $0 Implemented
MZ0072 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,200 $56,140 Implemented
MZ0072 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,875 $1,120 Implemented
MZ0072 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,345 $0 Not Implemented
MZ0072 # 08 Y:2012 08 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,583 $0 Not Implemented
MZ0072 # 13 Y:2012 13 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,046 $0 Implemented
MZ0072 # 07 Y:2012 07 2012 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $36,070 $1,160 Implemented
MZ0072 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $2,260 $400 Implemented
OK0629 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $947 $308 Implemented
OK0629 # 04 Y:2001 04 2001 AIR CONDITION ONLY SPACE NECESSARY $4,536 $400 Implemented
OK0629 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,735 $180 Implemented
OK0629 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $392 $627 Not Implemented
OK0629 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $190 $0 Not Implemented
OK0629 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $374 Not Implemented
OK0629 # 03 Y:2001 03 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $193,540 $25,975 Not Implemented
KU0379 # 07 Y:1992 07 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $517 $150 Implemented
KU0379 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $5,891 $1,000 Not Implemented
KU0379 # 08 Y:1992 08 1992 INSTALL SET-BACK TIMERS $1,099 $1,050 Not Implemented
KU0379 # 06 Y:1992 06 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,760 $20,620 Not Implemented
KU0379 # 04 Y:1992 04 1992 AIR CONDITION ONLY SPACE NECESSARY $6,390 $34,000 Not Implemented