IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,301

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0283 # 06 Y:1989 06 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,986 $4,440 Not Implemented
KU0283 # 07 Y:1989 07 1989 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $318 $0 Not Implemented
KU0283 # 08 Y:1989 08 1989 REDESIGN PROCESS $11,461 $13,200 Not Implemented
KU0283 # 09 Y:1989 09 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $241 $0 Implemented
KU0283 # 10 Y:1989 10 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,395 $2,300 Not Implemented
CO0147 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $440 $200 Implemented
CO0147 # 02 Y:1989 02 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,000 $400 Not Implemented
CO0147 # 03 Y:1989 03 1989 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $932 $37 Implemented
CO0147 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,785 $3,400 Implemented
CO0147 # 05 Y:1989 05 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $490 $200 Not Implemented
CO0147 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,986 $1,862 Implemented
CO0147 # 07 Y:1989 07 1989 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,720 $250 Implemented
CO0146 # 01 Y:1989 01 1989 INSTALL AUTOMATIC STACK DAMPER $2,510 $900 Not Implemented
CO0146 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,830 $3,670 Implemented
CO0146 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,283 $1,360 Implemented
CO0146 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $875 $1,859 Implemented
CO0146 # 05 Y:1989 05 1989 INSTALL TIMERS AND/OR THERMOSTATS $860 $1,160 Implemented
CO0146 # 06 Y:1989 06 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $690 $100 Implemented
CO0146 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $480 $300 Not Implemented
AT0124 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $4,585 $1,600 Not Implemented
AT0124 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $656 $500 Implemented
AT0124 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $34,933 $2,700 Implemented
AT0124 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,104 $8,224 Not Implemented
AT0124 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $422 $219 Not Implemented
AT0124 # 06 Y:1989 06 1989 RECOVER AND REUSE COOLING WATER $2,824 $1,200 Implemented