Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,301
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0399 # 04 Y:2015 | 04 | 2015 | UPGRADE OBSOLETE EQUIPMENT | $1,131 | $4,339 | Not Implemented |
SU0399 # 05 Y:2015 | 05 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,686 | $33,817 | Not Implemented |
IP0050 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,927 | $0 | Implemented |
IP0050 # 02 Y:2015 | 02 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $3,405 | $163 | Implemented |
IP0050 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,187 | $1,400 | Implemented |
IP0050 # 04 Y:2015 | 04 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $666 | $543 | Implemented |
IP0050 # 05 Y:2015 | 05 | 2015 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,184 | $1,792 | Not Implemented |
IP0050 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,242 | $4,203 | Implemented |
IP0050 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,348 | $5,370 | Implemented |
IP0050 # 08 Y:2015 | 08 | 2015 | OPTIMIZE PLANT POWER FACTOR | $10,314 | $19,140 | Not Implemented |
IP0050 # 09 Y:2015 | 09 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,085 | $21,918 | Not Implemented |
MZ0171 # 01 Y:2015 | 01 | 2015 | AIR CONDITION ONLY SPACE NECESSARY | $1,588 | $0 | Not Implemented |
MZ0171 # 02 Y:2015 | 02 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,781 | $0 | Not Implemented |
MZ0171 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,759 | $3,900 | Not Implemented |
MZ0171 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $2,783 | $880 | Not Implemented |
MZ0171 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,558 | $870 | Not Implemented |
WM0075 # 01 Y:2015 | 01 | 2015 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $331,900 | $300,000 | Not Implemented |
WM0075 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $68,035 | $93,132 | Not Implemented |
WM0075 # 03 Y:2015 | 03 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $52,881 | $34,000 | Not Implemented |
WM0075 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,819 | $46,125 | Not Implemented |
WM0075 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,025 | $1,280 | Not Implemented |
WM0075 # 06 Y:2015 | 06 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,069 | $852 | Not Implemented |
WM0075 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $1,880 | $330 | Not Implemented |
WM0075 # 08 Y:2015 | 08 | 2015 | INSULATE BARE EQUIPMENT | $2,454 | $1,014 | Not Implemented |
WM0075 # 09 Y:2015 | 09 | 2015 | INSULATE BARE EQUIPMENT | $270 | $495 | Implemented |