IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,301

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0399 # 04 Y:2015 04 2015 UPGRADE OBSOLETE EQUIPMENT $1,131 $4,339 Not Implemented
SU0399 # 05 Y:2015 05 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,686 $33,817 Not Implemented
IP0050 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,927 $0 Implemented
IP0050 # 02 Y:2015 02 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,405 $163 Implemented
IP0050 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,187 $1,400 Implemented
IP0050 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $666 $543 Implemented
IP0050 # 05 Y:2015 05 2015 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,184 $1,792 Not Implemented
IP0050 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,242 $4,203 Implemented
IP0050 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,348 $5,370 Implemented
IP0050 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $10,314 $19,140 Not Implemented
IP0050 # 09 Y:2015 09 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,085 $21,918 Not Implemented
MZ0171 # 01 Y:2015 01 2015 AIR CONDITION ONLY SPACE NECESSARY $1,588 $0 Not Implemented
MZ0171 # 02 Y:2015 02 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,781 $0 Not Implemented
MZ0171 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,759 $3,900 Not Implemented
MZ0171 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $2,783 $880 Not Implemented
MZ0171 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $870 Not Implemented
WM0075 # 01 Y:2015 01 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $331,900 $300,000 Not Implemented
WM0075 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $68,035 $93,132 Not Implemented
WM0075 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,881 $34,000 Not Implemented
WM0075 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,819 $46,125 Not Implemented
WM0075 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,025 $1,280 Not Implemented
WM0075 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,069 $852 Not Implemented
WM0075 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,880 $330 Not Implemented
WM0075 # 08 Y:2015 08 2015 INSULATE BARE EQUIPMENT $2,454 $1,014 Not Implemented
WM0075 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $270 $495 Implemented