IAC logo
IAC Assessment: BD0478
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0478
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2016
Principal Product Printed paper goods
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 48
Plant Area (Sq.Ft.) 60,000
Annual Production 1,400,000 Pounds
Production Hrs. Annual 4,400
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,444 1,321,324 kWh $0.10
Electricity Demand $47,349 5,127 kW-months/year $9.24
Electricity Fees $420 - $ -
Natural Gas $11,808 1,877 MMBtu $6.29
TOTAL ENERGY COSTS $198,021
RECOMMENDED SAVINGS* $26,166 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,959
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,978
Cost:
$3,229
$3,953 37,715 $1,025 111 - - - - - - - - $3,953
37,715
kWh
$1,025
111
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,345
Cost:
$15
- - - - $2,345 405 - - - - - - -
-
kWh
-
-
kW-months/year
$2,345
405
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,961
Cost:
$15
$1,581 15,085 $380 41 - - - - - - - - $1,581
15,085
kWh
$380
41
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,217
Cost:
$1,000
$981 9,361 $236 26 - - - - - - - - $981
9,361
kWh
$236
26
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,111
Cost:
$575
$733 6,991 $89 10 - - $121 - $168 - - - $733
6,991
kWh
$89
10
kW-months/year
-
-
MMBtu
$121
-
$
$168
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$784
Cost:
$900
$658 6,278 $126 14 - - - - - - - - $658
6,278
kWh
$126
14
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$751
Cost:
$450
$552 5,266 $199 22 - - - - - - - - $552
5,266
kWh
$199
22
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$13,019
Cost:
$7,560
- - - - - - $360 - - - $12,659 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$360
-
$
-
-
$
$12,659
-
$
TOTAL RECOMMENDED Savings:
$26,166
Cost:
$13,744
$8,458 80,696 $2,055 223 $2,345 405 $481 - $168 - $12,659 - $8,458
80,696
kWh
$2,055
223
kW-months/year
$2,345
405
MMBtu
$481
-
$
$168
-
$
$12,659
-
$
TOTAL IMPLEMENTED Savings:
$21,959
Cost:
$12,704
$7,173 68,439 $1,767 192 - - $360 - - - $12,659 - $7,173
68,439
kWh
$1,767
192
kW-months/year
-
-
MMBtu
$360
-
$
-
-
$
$12,659
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Primary Product