IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0320 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,159 $1,360 Implemented
LE0320 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,200 $5,076 Not Implemented
LE0320 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $356 $180 Implemented
LE0320 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $9,057 $19,312 Implemented
LE0320 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $6,336 $12,169 Not Implemented
IC0184 # 07 Y:2011 07 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $65,425 $345,000 Not Implemented
IC0184 # 06 Y:2011 06 2011 USE RADIANT HEATER FOR SPOT HEATING $2,000 $7,588 Implemented
IC0184 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,121 $3,748 Implemented
IC0184 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,215 $5,303 Implemented
IC0184 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,196 $20,077 Implemented
IC0184 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,671 $21,422 Implemented
IC0184 # 01 Y:2011 01 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $265,693 $277,838 Not Implemented
MI0204 # 08 Y:2011 08 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,252 $4,571 Not Implemented
MI0204 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,858 $3,943 Not Implemented
MI0204 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $50 Implemented
MI0204 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,117 $9,600 Not Implemented
MI0204 # 04 Y:2011 04 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,856 $9,183 Not Implemented
MI0204 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,367 $2,550 Implemented
MI0204 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,475 $1,320 Implemented
MI0204 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,841 $46,645 Not Implemented
IA0461 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $384 $20 Not Implemented
IA0461 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $13,101 $5,000 Not Implemented
IA0461 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,898 $1,649 Not Implemented
IA0461 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,749 $12,616 Not Implemented
IA0461 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,492 $1,078 Not Implemented