IAC Assessment: IC0184
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0184
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2011
Principal Product Publication Printing and Binding
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $100,000,000-$500,000,000
# of Employees 640
Plant Area (Sq.Ft.) 600,000
Annual Production 52,000,000 Units
Production Hrs. Annual 8,424
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,562,500 48,922,817 kWh $0.05
Electricity Demand $46,196 8,069 kW-months/year $5.73
Natural Gas $904,481 179,114 MMBtu $5.05
TOTAL ENERGY COSTS $3,575,737
RECOMMENDED SAVINGS* $360,321 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,203
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Gaseous Waste Electricity Usage Electricity Demand Natural Gas Gaseous Waste
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$265,693
Cost:
$277,838
$342,941 6,595,001 $51,767 9,034 $(-129,015) (-25,548) - - $342,941
6,595,001
kWh
$51,767
9,034
kW-months/year
$(-129,015)
(-25,548)
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,671
Cost:
$21,422
$7,495 144,184 $1,176 205 - - - - $7,495
144,184
kWh
$1,176
205
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,196
Cost:
$20,077
$9,651 185,409 $1,545 269 - - - - $9,651
185,409
kWh
$1,545
269
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,215
Cost:
$5,303
$3,628 69,743 $587 103 - - - - $3,628
69,743
kWh
$587
103
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,121
Cost:
$3,748
- - - - $3,121 618 - - -
-
kWh
-
-
kW-months/year
$3,121
618
MMBtu
-
-
lb
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,000
Cost:
$7,588
- - - - $2,000 396 - - -
-
kWh
-
-
kW-months/year
$2,000
396
MMBtu
-
-
lb
07: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$65,425
Cost:
$345,000
$(-64,311) (-1,236,733) $(-10,177) (-1,776) - - $139,913 3,610,000,000 $(-64,311)
(-1,236,733)
kWh
$(-10,177)
(-1,776)
kW-months/year
-
-
MMBtu
$139,913
3,610,000,000
lb
TOTAL RECOMMENDED Savings:
$360,321
Cost:
$680,976
$299,404 5,757,604 $44,898 7,835 $(-123,894) (-24,534) $139,913 3,610,000,000 $299,404
5,757,604
kWh
$44,898
7,835
kW-months/year
$(-123,894)
(-24,534)
MMBtu
$139,913
3,610,000,000
lb
TOTAL IMPLEMENTED Savings:
$29,203
Cost:
$58,138
$20,774 399,336 $3,308 577 $5,121 1,014 - - $20,774
399,336
kWh
$3,308
577
kW-months/year
$5,121
1,014
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Gaseous Waste Electricity Usage Electricity Demand Natural Gas Gaseous Waste